ZAO 'Timer' Scientific company ZAO 'Timer'
Georadars / Our works Russian
About company
Services
Links to us
News
Contacts
Georadars
Software
Our works
Expeditions-2009
Expeditions-2008
Expeditions-2007
Expeditions-2006
Karmadon
St.Petersburg
Metro in Kazan
River Ermisch
Australia
Mines
Other examples
Our publications
Optic Electronics
Systems
Objectives
Examples
Articles
Engines
Questions concerning FASM
Defining of depth for pipe 500 m under the river Ermisch.

To view image in full scale double click on it by mouse.

Georadar images of cable and pipe 700 mm as hyperbolas (binary form)

Georadar images of cable and pipe 700mm as hyperbolas (binary form).

Communication cable (h=0.85m).
Pipe 700 (h=1.20m).

Sample (from 74) full-wave signals during sounding of the pipe under the river bottom

Sample (from 74) full-wave signals during sounding of the pipe under the river bottom.

Most likely there is a hill of filled non-natural soil over the pipe. Depth of bedding is 2m, soil thickness is 0.8m.

Defining of depth for pipe 500mm under the river Ermisch

Defining of depth for pipe 500mm under the river Ermisch.

4ns - ice surface, 4ns (22 cm) - ice depth, 62ns (1.0m) - water depth, 16ns (0.8m) - soil stratum over the pipe. Totally the depth of pipe position is 2.0m from the ice surface. Error exceeds 60% by hyperbola.

Over ice, antenna 1m. (Binary form) Over ice, antenna 1m. (Binary form).

Copyright 2002-2009 ZAO 'Timer'